2023英文采购合同模板

更新时间:2023-03-20 21:13:34 发布时间:24小时内 作者:文/会员上传 下载docx 收藏

★以下是i乐德范文网为大家整理的2023英文采购合同模板文章,供大家参考!
[小编提示]更多合同范本请点击i乐德范文网以下链接:
租房合同|劳动合同|租赁合同|劳务合同|用工合同|购销合同|离婚协议书


 Contract No.:XXX

  Sales and Purchase ContractFOR

  Manganese Ore

  This contract is made and entered into onXX, Feb2023under terms and conditions as per the international chamber of commerce-600 (ICC UCP-600/2023 revision) by and between:

  The Buyer:

  Address:

  Tel:

  The Seller :

  Address:

  Tel:

  Whereby seller agrees to sell to buyer and Buyer agrees to buy from seller Manganese Ore under following the terms and conditions stipulated below:

  Article 1 Commodity

  Concentrated manganese Ore

  Article 2 Specifications

  Concentrated Manganese Ore

  Size: 0-5mm (90% min)

  % Mn min. 40.0%

  % Fe max. 15.0%

  % Silica ( SiO2 ) max. 1.0%

  % Aluminum ( Al ) max. 4.0%

  % S max. 0.20%

  % P max. 0.10%

  Moisture max. 7%

  Article 3 Quantity:

  500 MT, partial shipment not allowed.

  Article 4 Origin and Port of loading

  4.1 Republic of ABC

  4.2 Loading port:

  Article 5 Packing/Delivery

  5.1 In50 kg sack

  5.2 Incontainer Shipment, more or less 20 tons.

  Article 6 Shipment/Delivery

  6.1 500MT(+/-5%)partial shipment not allowed

  6.2 Shipment will be 90 days after signing of this contract and after the acceptance of the Letter of Credit by seller’s bank. L/C will be openedafter BuyerreceivingProforma Invoice from Sellerwith confirmation of the delivery schedule.

  6.3 The Buyer has the right to appoint the independent surveyor or his representative to conduct the Pre-shipment Inspection and/or conduct the joint-inspection of the material with buyer for his own account.

  Article 7 Contracted Price and Values

  Price:Mn: 48% and above - USD0.00/%/DMTCFRCY Port, China

  40% - 47.9% - USD 0.00 /%/DMTCFRCY Port, China

  The Mn content will be average of the joint-inspection testing result at loading port.

  Article 8 Payment

  8.1 Payment shall be effected in full by an irrevocable Letter of Credit, which will be opened by 1stclass bank in Hong Kong or Singapore, 100% at sight upon presentation of shipping documents.

  A. Seller’s Banking Details:

  Bank Name :

  Bank Address :

  Account Name :

  S.W.I.F.T. CODE SWIFT :

  B. Buyer’s bank issues L/C to the Seller's bank via S.W.I.F.T. wire transfer. Buyer’s Banking Details:

  Bank Name : (will be advised)

  Bank Address :

  Account Name:

  S.W.I.F.T. Address SWIFT :

  Article 10 Inspection of Analysis & Weight

  The shipmentinspection and analysis shall be done byCCICappointed by the Seller and one independent surveyor (i.e.: SGS or Geo-Chem, etc) appointed by the buyeras agreed by both parties at site before loading to container. While final weightand qualitydetermination shall be done atloadingportby the above joint-survey.Moisture content shall be deducted from the total weight shipped.

  Article 11 Documents

  Seller shall present the following documents to the buyer:

  A. Signed Commercial Invoice for 100% of the total cargo value indicating, quantity, unit price and the total Amount of Value of the delivered commodity , 1 original and 3 copies.

  B. Certificates of quantity, quality and weight issued byCCICand one independent surveyor appointed by the buyer.

  C. Certificate of Origin issued by ABC Department Of Trade or concerned Government authorities, I original and 2 copies.

  D. Weight List, showing total weight , 1 original and 3 copies.

  E. Bill of Lading, 3 original copies and 3 non-negotiable copies.

  Article 12 Force Majeure

  The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeureunder UCP 600. The seller shall advise the buyer immediately of the occurrence mentioned above and within 3 days thereafter the seller shall send a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the seller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than 60 days the buyer shall have the right to cancel the Contract.

  Article 13 Arbitration

  All disputes arising out of or in connection with this Contract shall be finally resolved by arbitration in accordance with the Rules of Arbitration of the International Chamber of Commerce (UCP-600/2023 or Uniform Customs and Practice for Documentary Credits) by one or more arbitrators appointed in accordance with the said rules. The arbitration shall be conducted in ABCbythe English language. Buyer Seller

(Authorized signature/seal) (Authorized signature/seal)

推荐阅读:

  2023英文采购合同范本

  2023安装采购合同样本

  地板采购合同格式

  2023年设备采购合同样本

  2023设备采购合同样本【三篇】

  2023年安装采购合同样本

热门标签: 模板 英文 采购合同
2023英文采购合同模板.docx

将本文的Word文档下载到电脑

推荐度:

下载

为您推荐

2024年房屋委托租赁合同提前解除(十九篇)

房屋委托租赁合同提前解除一受托人乙方:根据《中华人民共和国合同法》相关规定为明确双方的权利、义务甲乙双方特订立本合同双方共同遵守第一条、 甲方将位于北京市亦庄经济技术开发区科创十三街18号院 号楼 室 建筑面积 平方米,房屋所有权证号【 】委托乙方作为甲方

租赁合同2024-03-29 12:03:37

过路合同承诺书(20篇)

放弃合同承诺书 过路合同承诺书一1、认真贯彻执行上级相关的制度、规定、办法,在项目经理直接领导下,主管承发包管理、合同管理、成本核算、变更索赔、验工计价等工作。2、认真做好劳务承发包管理工作,选用“三证一书”齐全的队伍,并要求提供“三证一书”原件及其与民工

其它合同2024-03-14 11:03:26

最新油墨采购合同(3篇)

油墨采购合同一甲方:_________________委托代理人:_________________联系地址:_________________联系电话:_________________开户行:_________________账号:__________

采购合同2024-04-17 12:04:40

最新工程合同终止协议书(二十篇)

工程合同终止协议书一乙方:____________甲方____与乙方____原于___年___月___日签订的庞庄村新型农村社区建设合同,现经双方协商同意,合同于___年___月___日予以解除,乙方提前撤出施工现场,乙方提前撤出施工现场,本着坦诚真挚、相

建筑工程合同2024-07-01 12:07:55

最新出版合同关系的客体(22篇)

出版合同关系的客体一甲方(权利人):_____地址:_____乙方(出版者):_____地址:_____作品名称:_____作者姓名:_____第四条?乙方向甲方支付版权使用费的方式(任选其一):1.版税:版定价___________________%__

其它合同2024-03-14 11:03:25

起重机租赁合同版本(24篇)

起重机租赁合同版本一第一条 工程名称:施工地点:第二条 租赁期限进场时间:____月。起用时间:________年____日。合同期限:____月。第xx条 租金计费方法及交纳期限1、塔机租赁合同签定后,在机械进场钱乙方需缴纳甲方押金(中途不抵冲租金)。2

租赁合同2024-03-29 12:03:36